LRT Ampang Line
Sentul Timur ↔ Ampang · 18 stations · opened in 1996
About the LRT Ampang Line
The LRT Ampang Line (AG) runs between Sentul Timur and Ampang and serves 18 stations. It opened in 1996 (first section, 16 December 1996); it reached Sentul Timur in 1998. According to the timetable data published by Prasarana (GTFS), a full trip takes about 28 minutes, with trains every 3 minutes at peak times and every 5 minutes off-peak. You can change to other Rapid KL rail lines at Titiwangsa, Masjid Jamek, Plaza Rakyat, Hang Tuah, Chan Sow Lin and Maluri.
Stations
The Ampang and Sri Petaling lines share the same tracks between Sentul Timur and Chan Sow Lin, where they split. The line opened in 1996 (first section, 16 December 1996); it reached Sentul Timur in 1998.
Frequently asked questions
The LRT Ampang Line is one of the 7 Rapid KL urban rail lines in the Klang Valley. It runs from Sentul Timur to Ampang and serves 18 stations.
A full trip from Sentul Timur to Ampang takes about 28 minutes according to the operator’s timetable data (GTFS).
Trains run about 06:00–23:25 every day. On weekdays they come every 3 min at peak times (06:00–09:00, 17:00–19:00) and every 5 min off-peak; at weekends every 5 min.
Titiwangsa (PY/MR); Masjid Jamek (KJ); Plaza Rakyat (KG); Hang Tuah (MR); Chan Sow Lin (SP/PY); Maluri (KG).