MRT Putrajaya Line

Kwasa Damansara ↔ Putrajaya Sentral · 36 stations · opened in 2022

36
stations
9
interchanges
~68 min
end-to-end
4–5 min
peak frequency

About the MRT Putrajaya Line

The MRT Putrajaya Line (PY) runs between Kwasa Damansara and Putrajaya Sentral and serves 36 stations. It opened in 2022 (Kwasa Damansara–Kampung Batu, 16 June 2022); it reached Putrajaya Sentral on 16 March 2023. According to the timetable data published by Prasarana (GTFS), a full trip takes about 68 minutes, with trains every 4–5 minutes at peak times and every 7–10 minutes off-peak. You can change to other Rapid KL rail lines at Kwasa Damansara, Titiwangsa, Ampang Park, TRX, Chan Sow Lin and Sungai Besi.

Did you know…

The two MRT lines meet at Kwasa Damansara, where passengers can change between them across the platform. The line opened in 2022 (Kwasa Damansara–Kampung Batu, 16 June 2022); it reached Putrajaya Sentral on 16 March 2023.

Interchanges

Sungai BulohKTM Komuter (Port Klang Line) and KTM ETS
Kampung BatuKTM Komuter (Batu Caves Line)
Putrajaya SentralERL KLIA Transit

Frequently asked questions

The MRT Putrajaya Line is one of the 7 Rapid KL urban rail lines in the Klang Valley. It runs from Kwasa Damansara to Putrajaya Sentral and serves 36 stations.

A full trip from Kwasa Damansara to Putrajaya Sentral takes about 68 minutes according to the operator’s timetable data (GTFS).

Trains run about 06:00–00:00 on weekdays and 06:00–22:55 at weekends. On weekdays they come every 4–5 min at peak times (07:00–09:30, 17:00–19:30) and every 7–10 min off-peak; at weekends every 10 min.

Kwasa Damansara (KG); Titiwangsa (AG/SP/MR); Ampang Park (KJ); TRX (KG); Chan Sow Lin (AG/SP); Sungai Besi (SP).