LRT Shah Alam Line
Bandar Utama ↔ Johan Setia · 20 stations · opened in 2026
About the LRT Shah Alam Line
The LRT Shah Alam Line (SA) runs between Bandar Utama and Johan Setia and serves 20 stations. It opened in 29 June 2026 (Bandar Utama–Johan Setia, 20 stations; 5 more stations are planned). According to the timetable data published by Prasarana (GTFS), a full trip takes about 66 minutes, with trains every 8 minutes at peak times and every 10 minutes off-peak. You can change to other Rapid KL rail lines at Bandar Utama and Glenmarie 2.
The Shah Alam Line opened on 29 June 2026 with 20 stations; five more stations (Tropicana, Temasya, Raja Muda, Bukit Raja Selatan and Bandar Botanik) are planned for a later phase.
Interchanges
Frequently asked questions
The LRT Shah Alam Line is one of the 7 Rapid KL urban rail lines in the Klang Valley. It runs from Bandar Utama to Johan Setia and serves 20 stations.
A full trip from Bandar Utama to Johan Setia takes about 66 minutes according to the operator’s timetable data (GTFS).
Trains run about 06:00–00:00 on weekdays and from 06:00 until between 23:10 and 00:00 at weekends. On weekdays they come every 8 min at peak times (07:00–09:00, 16:30–19:30) and every 10 min off-peak; at weekends every 10 min.
Bandar Utama (KG); Glenmarie 2 (KJ).